his water was madeto wash the concrete out of the bucket, andthe whole mass, striking the reinforcement ofthe arch, was thoroughly remixed and floodedinto place. This concrete required less work-ing than any other place now under construc-tion and the arches have been uniformly good The mixing… … Fig. 11—Glaise Creek Joint Sewer. Blackburn Pile Puller. Closing Line Pulling up a 20-ft. Pile. will average 8 men, and the plant can turn outabout 18 yds. of concrete per hour. At the third opening, a 2 sack batch inixctis carried along the edge of the ditch and theconcrete is spouted directly…