Inside Out Library · Explore

Buildings (1922)

Chicago : Engineering and Contracting Pub. Co. · leaf 656

An illustration from Buildings, 1922, leaf 656
er of the de-posit in the lake bed, the difficulty of handlingthe water was less than was found in caringfor the ground flow further removed fromthe lake. THE STANDPIPE. As the system operates by gravity exceptduring fires, it was necessary to provide stor- construction view of the standpipe. The… … Fig. A—Placing the Concrete Dome. The forms were built in sections 5 ft. inlength by 3 ft. in height, and two complete in-side and outside rings were used. The formswere of 1-in. clear lumber, dressed one sideand two edges and nailed into a vertical po-sition. Before the forms were used they…

Buildings

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from Buildings

More like this