Chicago : Engineering and Contracting Pub. Co. · leaf 68
(steam or electricity) and power-distribu-tion, drainage, screen-house for screenings, andrailroad tracks, scales and yards. The most modern plants have been builtof great capacity, with large unit-piles of from50,000 to 60,000 tons capacity, with the resultof reducing the first cost of a complete… … Combined V Bucket Elevator & Conveyor Fig. 5.—Erie Railroad Covered Storage and Transfer Plant, Hammond, Ind. Cross Section. the end without the velocity which would beacquired in a free slide for the length of thechute. The screenings are collected in hoppers inthe towers, and in modern plants…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.