Chicago : Engineering and Contracting Pub. Co. · leaf 94
mat-ter, soil and silt, part of the excavation beingwet, and all being transported either by wheel-barrows or small push cars. The cost percubic yard for this work was $1.28. The costof 9.000 cu. yds. of rock till, including cost ofdrilling and shooting, was $1.41 per cu. yd.This cost also includes… … Fig. 6—View Showing Manner of Sluicing Down Embankment Formed by Dump Train. 8o ENGINEERING & CONTRACTING 1,117 cu. yds. of concrete in the outlet tun-nel and controlling works was $14.82 per cu.yd. The cost of the earth till was as fol- lows : Excavating and Loading: Cents Labor drilling 2.3…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.