Inside Out Library · Explore

Lake ship yard methods of steel ship construction (1907)

Curr, Robert · Cleveland : The Marine review · leaf 150

An illustration from Lake ship yard methods of steel ship construction, 1907, leaf 150
P CONSTRUCTION 139 head is also riveted with all the parts and erected in place completeso that very little is left to rivet when the peaks have the material inplace. All the skeleton work on the spar deck follows up after theframes are erected and riveted up before any of the stringers are puton,… … Fig. 153.- shell plating before the tank top plating is put on. This work followsup so closely that the tank top is on and riveted within 12 ft. of thegirders and shell plating and as the ballast piping is shipped alongwith the girder plates there is no delay for the tank top on that ac-count and…

Naval architecture · Ships, Iron and steel

Internet Archive · Cornell University Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from Lake ship yard methods of steel ship construction

More like this