Inside Out Library · Explore

Cyclopedia of architecture, carpentry, and building : a general reference work (1912)

American Technical Society · Chicago : American Technical Society · leaf 180

An illustration from Cyclopedia of architecture, carpentry, and building : a general reference work, 1912, leaf 180
called for, and mouldings shouldbe cut according to details and matchedtogether perfectly. Ashlar work should becut with full bed joints without hollows orthin edges (Fig. Vy2), and should be cut so as to lie on its natural bed.Anchors should be freely used, and the bonding of ashlar and… … Fig. 15-2. Improper StoneCuttiiiK- 148 BUILDING SUPERINTENDENCE IHB continuous courses to each other at the ends should be insisted upon.Projecting courses must be bevelled off on the top to shed water andshould also have a drip cut on the under side, so that the water willdrop off and not run down…

Architecture · Building

Internet Archive · Kelly Library, University of Toronto · Public Domain Mark 1.0. Free to use for anything.

More pictures from Cyclopedia of architecture, carpentry, and building : a general reference work

More like this