Cyclopedia of locomotive engineering, with examination questions and answers; a practical manual on the construction care and management of modern locomotives (1916)
Swingle, Calvin Franklin, 1846- [from old catalog] · Chicago, F. J. Drake & co., pub. for Sears, Roebuck & co. · leaf 414
ean,strained oil through fillingplug A, and immediatelyafter filling, open watervalve D. Open steam valve(not shown), wait untilsight-feed chambers are filledwith water, then start and regulate the feed by open-ing regulating valves C, more or less, according to thefeed desired. To stop either of… … Figure 195 The Kttnkle Pop Valvefor locomotive boilers 4oo LOCOMOTIVE ENGINEERING diately after filling, whether the feed is started again, or not. To oil by hand,close the steamvalve. Fill thehand oilers O,open the hand oil-er valves, andwhen all the oilhas entered thetallow pipes, closehand oiler…
Locomotives
Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.