Inside Out Library · Explore

The design, construction and test of a direct reading engine indicator (1917)

Tower, Alexander McJunkin, Siegmund, Humphreys Oliver · leaf 54

An illustration from The design, construction and test of a direct reading engine indicator, 1917, leaf 54
ith the subtraction ofpressure on the compression stroke. This operation was secured bymeans of a commutator which is discussed in a later section dealingwith negative work. Figure 24 shows a photograph of the completed indicator andFigure 25 shows a detail of the construction. Referring to… … 23 pillar to the lip L which is a part of the original indicator.The fibre support B holding the bridge wire is held in place by thebrass pillars C and is bolted down as shown. The other fibre bridgewire support D is held in place by smaller brass rods E. The bridgewire W is held in brass lugs that…

Internal combustion engines · Theses

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from The design, construction and test of a direct reading engine indicator

More like this