Inside Out Library · Explore

Electricians' operating and testing manual; (1910)

Horstmann, Henry C. [from old catalog], Tousley, Victor Hugo, 1875- [from old catalog] joint author · Chicago, F. H. Drake & co · leaf 332

An illustration from Electricians' operating and testing manual;, 1910, leaf 332
nt coilof the standard meter and connection can then be madedirectly across the outside mains. If the shunt cir-cuit of the meter under test is connected between oneof the outside mains and the neutral wire a test may bemade by using one standard wattmeter and connecting 330 Operating and Testing… … Figure 196 nected as shown in Figure 197. The sum of the stand-ard meter readings should equal the reading of themeter being tested. In this case it is not necessary tobalance the load.

Electrical engineering · Electric testing

Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.

More pictures from Electricians' operating and testing manual;

More like this