ll done during very cold weather, in December andJanuary. The conveyor used on this contract was also employed by CONVEYORS 145 Messrs. Ryan and Parker for similar work in a great number ofplaces, its length being increased or diminished as desired byeasily made changes in the number of idlers and… … Fig. 68. in the mixer house, and run at a speed of 325 feet per minute.This engine also drove a 24-inch Robins Belt Conveyor whichcarried concrete from Smith mixers and discharged it through along chute to cars, which carried the concrete to all points wherefoundations and retaining walls were…