Inside Out Library · Explore

Handbook of construction plant, its cost and efficiency (1918)

Dana, Richard Turner, 1876-1928 · New York, McGraw-Hill book company, inc., [etc., etc.] · leaf 589

An illustration from Handbook of construction plant, its cost and efficiency, 1918, leaf 589
ace oiling of roadsand distributing bituminous binder consists of two horizontalcylindrical tanks with ducts leading to them from the tankwagon, and with a seat, and flow regulating levers. This can beattached very easily to any tank wagon or cart and costs $150. SHOVELS No. No. 3, No. 3, No. 3,… … $7.505.257.505.255.257.00 Fig. 270. Concrete Facing Spade. Concrete racing Spades similar to Fig. 270 cost about $2.50each. Fig. 271. Ore and Concrete Shovel. Ore and Concrete Shovels (Fig. 271) with a drop temperedpoint and annealed blade, well suited for concrete, come in sizes2 to 6, inclusive,…

Contractors' operations · Building

Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.

More pictures from Handbook of construction plant, its cost and efficiency

More like this