Handbook of construction plant, its cost and efficiency (1918)
Dana, Richard Turner, 1876-1928 · New York, McGraw-Hill book company, inc., [etc., etc.] · leaf 589
ace oiling of roadsand distributing bituminous binder consists of two horizontalcylindrical tanks with ducts leading to them from the tankwagon, and with a seat, and flow regulating levers. This can beattached very easily to any tank wagon or cart and costs $150. SHOVELS No. No. 3, No. 3, No. 3,… … $7.505.257.505.255.257.00 Fig. 270. Concrete Facing Spade. Concrete racing Spades similar to Fig. 270 cost about $2.50each. Fig. 271. Ore and Concrete Shovel. Ore and Concrete Shovels (Fig. 271) with a drop temperedpoint and annealed blade, well suited for concrete, come in sizes2 to 6, inclusive,…
Contractors' operations · Building
Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.