Inside Out Library

Instructions for testing telegraph lines and the technical arrangements of offices (1878)

Schwendler, Louis, 1838-1882 · London : Trèubner · leaf 200

An illustration from Instructions for testing telegraph lines and the technical arrangements of offices, 1878, leaf 200
electrum, well hammered,gives very constant springs of any strength and shape. J.YSTRUMENTS AND CONNECTIONS. 187 instrument-l3ar is connected with the lever of a key. Inorder to be able to branch off the leading wires to thekeys on both sides of the commutator, which is requiredfor the sake of… … the instrument ea^^th is to be connected. Although thedifferent modes of connecting up a commutator can beeasily understood from the diagram, for clearness sake afew examples may be given :— 188 OFFICE TESTING. Working the lines in S and T. In this case no stop-per is to be left in the holes h and…

Telegraph · Telegraph lines

Internet Archive · Northeastern University Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from Instructions for testing telegraph lines and the technical arrangements of offices

More like this