Bradbury, F. (Fred) · Manchester : John Heywood Ltd. · leaf 200
slip must bethreaded again through the mail of the doup standard and thecrossing warp threads drawn through as before. In Fig. 187 the gauze shed is formed by lifting the doupstandard b9 and the doup f on the remote side of the third and fourthwarp threads. The hooks and harness a5 and a7 are shown… … Fig. i9o. ig6 JACQUARD MECHANISM AND HARNESS MOUNTING. In Fig. 190 the natural shed in the gauze structure is formedby lifting the back standards a1 and a2 with threads 1 and 2. Thedoup rises in sympathy on the near or 7Z0/z-crossed side of the thirdand fourth threads of warp, and the easing…
Textile machinery
Internet Archive · Smithsonian Libraries · Public Domain Mark 1.0. Free to use for anything.