Mechanical equipment of buildings; a reference book for engineers and architects (1916)
Harding, Louis Allen, Willard, Arthur C. (Arthur Cutts), 1878-1960 · New York Wiley · leaf 552
10 V2 m ,- Roller -15 8 13 0 I drain to trap T^ y4 Auxil Note:- All high pressure valves 6 and above to have by-pass. ■Center Line of Main Header ELEVATION OF HEADERFig. la. Plan and Elevation of Single-Header System[ (See Fig. 6 for sectional elevation.) … ary Header 528 POWER PLANTS AND REFRIGERATION This system is the cheapest to install, and when properly designed and constructed makesa satisfactory layout. A valve should be placed in the header between each battery of boilersto provide for cutting out any section desired, in case repairs are…
Building · Heating · Ventilation