Inside Out Library

Radford's cyclopedia of construction; carpentry, building and architecture. Based on the practical experience of a large staff of experts in actual constrcution work (1909)

Johnson, Alfred Sidney, 1860-, Radford, William A., 1865- · Chicago Radford Architectural Co · leaf 118

An illustration from Radford's cyclopedia of construction; carpentry, building and architecture. Based on the practical experience of a large staff of experts in actual constrcution work, 1909, leaf 118
Fig. 65. Branch Pipe Connections for Accelerated Systems. it is advisable to take all branches from the sideof the main and to have them enter the side ofthe return, as shown in Fig. 65. The hot waterwill then flow to the end of each line before en-tering the branches, for, as previously stated,the… … 66, Branch Connections for Piping in Accelerated SystemsRunning Directly to Upper Jloors. top of the main and each branch will receive itsproper supply of hot water at about the sametime. There are some modifications of thismethod, however. For example, when a branchnear the heater feeds a riser to…

Architecture · Building

Internet Archive · Gerstein Library, University of Toronto · Public Domain Mark 1.0. Free to use for anything.

More pictures from Radford's cyclopedia of construction; carpentry, building and architecture. Based on the practical experience of a large staff of experts in actual constrcution work

More like this