Inside Out Library · Explore

Recent cotton mill construction and engineering (1894)

Nasmith, Joseph · London : J. Heywood · leaf 78

An illustration from Recent cotton mill construction and engineering, 1894, leaf 78
xwood washer,and the outer collar is soldered to the tube byfusible solder, a second boxwood washer being inter-posed between the end of the lever and the sealedcollar. The proportions of the two levers aresuch that the strain on the fusible solder is but a 75 small fraction of the weight on the… … chilling action of the water increasing its sensitive-ness. When the tubular jouit is melted the supportis taken from the deflector, which immediately fallsand allows the water to flow. The deflector spindlehas a collar on its upper end which supports it onthe collar fixed in the body. 76CHAPTER…

Textile factories -- Design and construction · Cotton manufacture · Cotton machinery

Internet Archive · UMass Dartmouth, Claire T. Carney Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from Recent cotton mill construction and engineering

More like this