Inside Out Library · Explore

A review of methods of bridge erection (1912)

Maver, David Blair · leaf 26

An illustration from A review of methods of bridge erection, 1912, leaf 26
ing a trackover the span.For new work,falsework must be built tocarry a temporary track.The gallows frames are erected ateach abutment and the car containing the girder run ontothe falsework until opposite its final position.The gal-lows frames pick the girder up off the car and over anddown into… … £r~ec/-/c>r7 by G/n /%>/<?. Fioure. 2.

Bridges · Theses

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from A review of methods of bridge erection

More like this