vity is the stretch of foreshore on the This structure, 46 feet In width, and 8,116 feet long, was built to divert the water from the Bite on which the crete gathering dam, 33 feet in width Canadian side, reaching from the com- gathering dam was built. and 26 to 33 feet in depth, was built out… … porary construction, varied from 20 to conduct the water to the bottom of the 46 feet in width, and had a total depth This excavation is 421 feet long, 37 feet wide, and 138 feet deep. wheel pit. of water against it, when it had reached The Wheel Pit.—The wheel pit is a At the Bottom of the…
Manufacturers · Niagara · Apparatus · Canal · American october · Scientific American · Power developments · Fundamental note · Wheel pit · Barge canal · Sheet metal · Sheldon school · Electric power · Reinforced concrete
Internet Archive · Public domain (published before 1931). Free to use for anything.