Inside Out Library · Explore

Riveting in metal airplane construction. Part II : riveting methods and equipment (concluded) (1930)

NASA Technical Reports Server (NTRS) · leaf 51

An illustration from Riveting in metal airplane construction. Part II : riveting methods and equipment (concluded), 1930, leaf 51
rivet inspection device, (Junkers Fig.74 Rivet head.(Dornier) type). Pig.76 ---a 1 Fig.73 closing -s&f I head ^< i Rivet ^ head, Ejgp head, 31 head, (Junkers) Rohrbach) £ s. e * Pre" Countersunk above -r- "T-Co^^ Fig-75 Standarised data on ^^^I^^o/a head shapes accord- head 8ize8 of flat… … Noterhole drilled 1/10 mm larger than body dia Pigs.82a,b <? J * J 6* 7 m/T7 4 Plat plates Plate thickness connected by Fig.83 Stress of one rivet. rivet hole due to sides of hole. Pig.86 Stress dis- tribution in weak- Pig.84 Shear in hole Pig.85 Tearing stress of ened cross section walls of rivet…

NASA Technical Reports Server (NTRS)

Internet Archive · NASA Technical Reports · Public domain (US government work). Free to use for anything.

More pictures from Riveting in metal airplane construction. Part II : riveting methods and equipment (concluded)

More like this