Inside Out Library · Explore

Architect and engineer (1905)

San Francisco : Architect and Engineer, Inc · leaf 120

An illustration from Architect and engineer, 1905, leaf 120
, Broadway, after theconstruction of the tunnel from Mason Streetto Larkin Street, will have an excellent gradefrom the Embarcadero to Fillmore Street.However, it would have but limited value unlessprovision were made for its ultimate extensionalong the south boundary of the Presidio to theCliff… … Columbus Avenue would be extended a shortdistance at both ends; at the inner end to theperimeter of distribution, and at the outer endto Jefferson Street. Fulton Street would be developed as a park-way, and widened along the edge of GoldenGate Park. Market Street would be made more directby…

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Architect and engineer

More like this