San Francisco : Architect and Engineer, Inc · leaf 400
e as equipment stalls on bothsides of the main body of the garage. The garageproper has a clear span of 84 feet without a postor obstruction. The garage floor, as well as theraised dock is concrete slab. The Portland terminal is part of a five-year, $4,-000,000 expansion program now underway on… … SEPTEMBER, 1952 MODERIV FREIGHT TERMIML ington; Missoula, Montana; Sacramento, Stocktonand Fresno, California. A $500,000 depot has alsobeen built at Spokane. The bowstring trusses are set throughout the 504feet of the single-story section of the structure at24-foot intervals. They rest on concrete…
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.