Handbook of construction plant, its cost and efficiency (1918)
Dana, Richard Turner, 1876-1928 · New York, McGraw-Hill book company, inc., [etc., etc.] · leaf 596
s drawn by a horse along a singletrack. The costs were as follows: Wages of engineer $ 4.00 Wages of fireman 2.00 Wages of one foreman 3.00 Wages of three laborers 5.25 Coal 4.00 Oil, waste, etc 1.00 Interest, depreciation and repairs (estimated) 5.30 Total $24.55 Cubic yards per day. 410 Cost per… … Fig. 284. 26 ft. deep in Chicago in 1909. (Fig. 284.) This shovel was ofthe latest design, equipped with a 54-ft. dipper handle and a2-yard dipper, with the operating levers placed far forward soas to enable the runner to see the bottom of the trench. The SHOVELS 593 shovel had been removed from…
Contractors' operations · Building
Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.