San Francisco : Architect and Engineer, Inc · leaf 21
and con-crete and has a parking capacity of 2800 cars. The building provides almost unobstructed entry and driving way visibility. Structural columns andgirders were kept at a minimum so that motoristswould not have to maneuver about them. Rampsleading to upper and lower parking levels werealso… … The 12-ton concrete slab, being in-stalled at the new Sylvania ElectricElectronics Plant in Mt. View, Califor-nia, is picked up by large crane andsnaked out backwards between roofsupports; is then tilted-up into properposition. The elapsed time for installation ofeach section is 13 minutes.…
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.