Inside Out Library

Architect and engineer (1905)

San Francisco : Architect and Engineer, Inc · leaf 263

An illustration from Architect and engineer, 1905, leaf 263
uilding a new Junior HighSchool, comprising 16 classrooms, ad-ministration room, library, home econom-ics, commercial, music, shops, gymnasium,shower and lockers, and toilet rooms. Construction will cost $7^0,000 and con-sist of concrete floors, frame and stucco,and asphalt tile floors. Alastair… … Easy to install singly or in multiples oftwo or more, to compensate for extraweight in heavily loaded drawers, slidingplatforms: feather touch operation; lowco.st; non-hinding and non-sticking; nontilting; quiet drawer operation; 12 sizesto fit drawer lengths lij-g to 24Yi.Packed 4 or 12 to a box.…

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Architect and engineer

More like this