San Francisco : Architect and Engineer, Inc · leaf 276
ers. In all, the building contains 7,100 tons ofstructural steel, 1750 tons of reinforcing steel, 28,000yards of concrete, and 100,000 sq. ft. of steel movablepartitions. One of the several problems connected with theCrocker First National Bank job in Oakland (see photoon page 21), was the… … ONE of first Dinwiddie Construction Company jobs in San Francisco .Pacific Terminal Warehouse. the Southern CISCO to Oakland, supervised by the Hermann SafeCo., of a 55-ton safe door. Too heavy to be swung intoplace by a crane, the door had to be lowered inch byinch on jacks. Weighing as much as…
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.