Inside Out Library · Explore

Architect and engineer (1905)

San Francisco : Architect and Engineer, Inc · leaf 133

An illustration from Architect and engineer, 1905, leaf 133
PAf?T/AL C/^OSS SECT/ON Of IA/AR£^OUSE MARCH, 1957 … PRE-CAST. Thin shell roof panels(left) being removed from forms.Stripping process requires aboutthree minutes. BELOW—Pouring more than 40,000cu. yds. concrete for floors. Screed-ed to grade and hand troweled to asmooth surface. heavy loads per square foot that the warehousingfloor will have to…

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Architect and engineer

More like this