Inside Out Library

Architect and engineer (1905)

San Francisco : Architect and Engineer, Inc · leaf 309

An illustration from Architect and engineer, 1905, leaf 309
n oneper cent to El Portal, where it connectswith the existing road from the Valley.The twelve miles of existing road fromEl Portal to Yosemite Village was con-structed prior to this time and in thisdistance it rises approximately 2,000 feetto the floor of the Valley, some 4,000 feetin elevation… … THREE 30.INCH CORRUGATED CULVERTSTht-^f culvfrta hnve been in»Ulk-d on the complet^l portion of the Yosemite Valley Roadbevelled ends to conform to headwull. the pipes being placed at an oblique angle. Note OCTOBER, 11)24 119

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Architect and engineer

More like this