Chicago : Engineering and Contracting Pub. Co. · leaf 174
ystem and a system ofstorm-water drains, and last Spring the vot-ers of the city ratified a second loan of$10,000,000 to complete the work. This newloan will become available on Jan. 1, 1912, at, which time the proceeds of the first loan willhave been practically exhausted. The workis now about… … Fig. 5—Wood Stave Discharge Pipes at Disposal Plant Ready to Lower Into Final Position. i6o ENGINEERING & CONTRACTING Vol. XXXVI. No. 6. too large to shut out the small contractor, to-gether with extensive advertising in both lo-cal and out of town papers, has resulted ina great saving in the…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.