Chicago : Engineering and Contracting Pub. Co. · leaf 211
4.17 Setting up generator: 4 hrs. at $0.30 $ 1.20 102 hrs. at $0.25 25.50 House mover 38.00 Erector 190.00 Total $254.70 Total cost of 1-U-or for moving and erect-ing engine and generator $967.97 ENGINEERING & CONTRACTING Vol. XXXVI. No. 7. Method of Tapping a 36-in. WaterMain Under Water,… … rnq i rarity Pir/n Fig. 1.—Section Showing Connection MadeUnder Water to 36-in. Main. sum l>cpartmcnt of the Iuriau nf KnKinccr- inK. <ity of Chicago. The- tunnel in which tin- water main is lo-cated passes under the Chicago Drainage(anal at Ked/ie Ave, and also under theIllinois and Michigan…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.