Opening6lue Opening -for Concrete < C- Clag Covered with Pi £ Model removed 1Mould ready to PourEnpHContq OCIau removed Opening for Blue Fig. 4. Sketches Showing Steps in Makingthe Glue Molds for the Pedestal. ing the jet about 8 ft. above the upper basin.Care was taken to have the upper basin… … Q JL_——-~r~ o- a :■ 6 !:{• o ■ A* b * V ■ 1 Cinders [. ; * 0 a ■■ * i o 6 * a Asphalt Walk Water Line A V a } Fig. 5. Detail of Basin and Curb for GardenPool. A detailed cost of the upper basin is as fol-lows : 1 carpenter, 1 day at $4.60 $ 4.6 1 molder, 2V> days at $4.60 11.50 1 helper. 2% days…