Chicago : Engineering and Contracting Pub. Co. · leaf 619
ed within the cemetery issmall, and an increase in the size of the trunksewer about 200 ft. above the upper end of thecontract, in Baden District No. 1. made an- done by loading the cableway buckets by shov-elers, except the upper 10 ft. of cut, whichwas removed by teams and wasted. From Station 26… … Fig. 10—Glaise Creek Joint District Sewer at Bates Street. other change in the cemetery unnecessary andpermitted the use of a 14-ft. horse-shoe sec-tion for the whole length—4,500 ft. Withthe exception of small reverse curves at Sta.ti and Sta. 41, the sewer is located on tangent. At this time,…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.