-iron seating plates of thewood arch, and the stone arches turned. In the meantime the cur-vature of the ribs had been set out upon a platform, and the carpen-ters proceeded with the framework. This being ready by the monthof August, preparations were made for laving the seating plates withinthe… … larch, or other wood piles,driven about fifteen feetapart in the length andwidth of the bridge ; 6, firbearer, upon which theproposed planking waslaid; from tins stage wereraised the standards c c, tosuch heights as the cur-vatureof the ribs required.As they proceeded fromthe springing of the…
Civil engineering · Architecture
Internet Archive · Boston Library Consortium · Public Domain Mark 1.0. Free to use for anything.