Inside Out Library

The elements of railroad engineering (1897)

International Correspondence Schools · Scranton, Pa. : The Colliery engineer co. · leaf 332

An illustration from The elements of railroad engineering, 1897, leaf 332
Cost to R. R. Company 22.39 cents per cubic yard. 1496. Drag Scraper Work.—The drag scraper (see Fig. 414) holds from .15 to .25 of a cubic yard of material. The same laborof horse and man is required^^ /-Q-N for the drag scraper as for the wheeled scraper, except-ing the snatch team. Theteam will… … 922 RAILROAD CONSTRUCTION.

Railroad engineering

Internet Archive · California Digital Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from The elements of railroad engineering

More like this