Inside Out Library · Explore

Handbook of construction plant, its cost and efficiency (1914)

Dana, Richard Turner, 1876-1928 · Chicago, The M. C. Clark Publishing Co. · leaf 152

An illustration from Handbook of construction plant, its cost and efficiency, 1914, leaf 152
Fig. per minute does the hoisting. The total weight of the crane is110 lbs. and its cost is about $9,000. The daily (10 hours) ex-pense of operating each crane was: 1 engineer $ 2.50 1 fireman 1.50 Machinist service 1.00 Superintendence 75 1 V-l tons coal 2.50 Oil and waste 25 Repairs (?) 50 Track… … 147 148 HANDBOOK OF CONSTRUCTION PLANT Hullett-McMyler Derrick. Fig. 71 illustrates this machine,which handles a skip weighing 2,400 lbs., making, with its fullload of 1% cubic yards of solid rock, 3% tons loaded. It weighs95 tons and costs $15,000. The cost of operation is practicallythe same as…

Contractors' operations · Building

Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.

More pictures from Handbook of construction plant, its cost and efficiency

More like this