s of 17 ft. x 11V2 ft. and wallsfrom 12 to 24 in. in thickness. The plant consisted of two principal parts, the first for crush-ing and mixing and the second for handling forms and concrete.The first part consisted of a steel frame work mounted on two60-ft. steel flat cars placed side by side and… … 426 MIXERS 427 the concrete was picked up by an electric hoist in Hains bucketsand conveyed to the forms. That part of the plant used inplacing- concrete and handling the outside forms consisted of atwo-truss steel bridge 140 feet long, upon which traveled theseveral hoists. The concrete bucket…