Inside Out Library · Explore

Marine engineering (1897)

New York, N.Y. : Marine Pub. Co. · leaf 407

An illustration from Marine engineering, 1897, leaf 407
OctoBER, 1906. 397 made unduly heavy. ‘The operation is reported to have been while the after section, or tail shaft, is of tobin bronze 3 inches very smooth in every respect, and the engine appears to repre- in diameter. ‘The couplings are forged on the shafts, disks being sent an extremely… … BED PLATE OF ENGINE, 6 inches, and the thrust shaft of 7 feet. The thrust bearing is TRIAL near the forward end of line shaft, and is of the usual collar Three of these engines were fitted respectively on the United type, with proper connection to the oil reservoir for lubrication. States steamers…

Shipbuilding -- Periodicals · Shipbuilding industry -- Periodicals

Internet Archive · Smithsonian Libraries · Public domain (published before 1931). Free to use for anything.

More pictures from Marine engineering

More like this