Inside Out Library · Explore

Sweet’s indexed catalogue of building construction for the year 1906 (1906)

New York : Chicago : Architectural Record · leaf 645

An illustration from Sweet’s indexed catalogue of building construction for the year 1906, 1906, leaf 645
to 1,000 H. P. in four to six weeks. These are built entirely of flange steel plates and thebest of tubes, no cast-iron whatever being used for anyparts under pressure. Pressed steel flanges, hand-holeand man-hole plates, etc., are used. The general construc-tion is shown by the illustration. This… … HEINE W.ATER TUBE BOILER SIZES, CAPACITIESAND PRICES. Sizes run from 75 to 500 H. P., and require a minimum head room when set offrom II to 17 feet. The same capacity of boiler can be furnished in several differentsizes to suit conditions. The widely varying conditions under which boilers have to…

Building materials

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Sweet’s indexed catalogue of building construction for the year 1906

More like this