A treatise on architecture and building construction (1899)
International Correspondence Schools · Scranton, The Colliery engineer co. · leaf 563
er should be sponged with hot water justbefore straining it around the col-umn. The column and the tinshould be heated before veneer-ing. The advantage of a tin caulis that it requires no waxing, andwill not stretch. A strip of paperwrapped around the core will besufficient to determine the… … 97. A tapering column is veneered in precisely thesame manner, but to find the length and shape of theveneer, lay out, as in Fig. 60, a b equal to the height of thecolumn and cd equal to the base; continue c e and dc to i;from i as a center, with ic and i c as radii, describe the arcsch and ef\…
Architecture · Building
Internet Archive · New York Public Library · Public Domain Mark 1.0. Free to use for anything.