A treatise on architecture and building construction (1899)
International Correspondence Schools · Scranton, The Colliery engineer co. · leaf 123
of fastening is neat and re-liable. All hooks or bands shouldclasp the pipe close underthe hub, or around it, andshould not be placed midway between the joints, if it is pos-sible to avoid it. Fig. 69. 16 PLUMBING AND GAS-FITTING. 113 If the pipes stand in a chase or groove in the wall, they maybe…
Architecture · Building
Internet Archive · New York Public Library · Public Domain Mark 1.0. Free to use for anything.