Inside Out Library

Types and details of bridge construction (1904)

Skinner, Frank W. (Frank Woodward), 1858-1932 · New York, McGraw · leaf 319

An illustration from Types and details of bridge construction, 1904, leaf 319
ing againsthorizontal anchor plates built into the concrete, and the uppernuts, at about the level of the pavement, are screwed up onhorizontal shelf angles with vertical reinforcement angles fittedagainst the lower flanges. The columns are filled solid withconcrete to a height of 2 ft. above the… … Regular Ccosa Girders Division No. 4. Typical Transverse Section. The kneebraces are field-riveted to the girders; all thesolid-web kneebraces are shop-riveted to the columns; theother kneebraces are field-riveted both to the columns and tothe girders. The kneebraces for the longitudinal girders…

Bridges

Internet Archive · Boston Library Consortium · Public Domain Mark 1.0. Free to use for anything.

More pictures from Types and details of bridge construction

More like this