Inside Out Library

The Architect & engineer of California and the Pacific Coast (1905)

San Francisco, Calif. : Architect and Engineer Co · leaf 257

An illustration from The Architect & engineer of California and the Pacific Coast, 1905, leaf 257
rk, but, if the cost is assured, it is immaterial to a contractor what thecontract may require or what changes, modifications, alterations, delays, etc.,the owner or his professional adviser may demand. It likewise follows that under the secured-cost contracts the accuracy ofthe specifications and… … Small Buildu •J tu Show the Possibilities of Rciuforced (.Panel) Briek IVork and the owner, or his professional adviser, can modify or correct them at theirpleasure without seriously affecting the rights of the contractor. Underunsecured-cost contracts, however, exceptional care should be given to…

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from The Architect & engineer of California and the Pacific Coast

More like this