Chicago : Engineering and Contracting Pub. Co. · leaf 145
nt after set- without cost to the contractor, provided thatany damages resulting to the city hydrantswhile in use for the purpose of water settlingwill be repaired by the City Water Depart-ment, and the cost of said repairs will be de-ducted in the contractors final estimate. Anyhose, pipe or other… … shall be plugged before leaving the work forthe night. Whenever it shall lie discovered that a leadjoint is less in depth than required by thesespecifications, the contractor will be required,at bis own expense, to drill, cut out, or other-wise remove the bad fre.m any or all jointsdesired,…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.