Inside Out Library · Explore

Buildings (1922)

Chicago : Engineering and Contracting Pub. Co. · leaf 408

An illustration from Buildings, 1922, leaf 408
beprepared for submission to the taxpayers fortheir approval. On approval of the taxpayersthe contract will be awarded. The subway is to be a double track rein-forced concrete structure, as shown in thesections, Figs. 2 and 3. It will be built ofreinforced concrete. The side walls are 2 ft.7 ins.… … — Ortgino/ tva.Y srrotvr? Retaining Wall for Track Elevation. laid in the trough thus formed which carriesthe water to manholes at the street lines con-nected with the city sewers. Six-inch drainsare also placed under the heel of the wallwhich connect with the same manholes. In order to bind the…

Buildings

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from Buildings

More like this