Fig. 3—View of Contractors Storage and Mixing Plant. Material Handled EntirelyBy Belt Conveyors. Concrete Docking Between Locks IsShown In Background. Just below this junction on the Mohawk, theCrescent Dam is situated, which, when com-pleted, will raise the water high enough togive a minimum depth… … Fig. A—Sketch Showing Economical Ar-rangement for Supplying Water to Mixer. May 21, 1906 and the contractor started workabout Jan. 1, 1907. The plant consisted oftwo 90-ton shovels, 6 dinkeys, 50 dump cars,1 Haines mixer, store house, cement shed,blacksmith shop, wagons, boilers and smalltools, 1…