Chicago : Engineering and Contracting Pub. Co. · leaf 679
ed |760 pet ii ti ii ii in, provided that thecont of current Khali not exceed !, ci-ntK pei KVVhour. Before the plant had been in operation two R is a 30,000 gal. reinforced concrete reser-voir designed to hold the night run of sew-age for the present and eventually to act inthe capacity of an… … Fig. 2—Cross Section of Flume. wasteway fur the treated sewage into theglib h The supply pipes arc separately oper-ated by three valves / The electrical ma-chinery is on a platform about 15 ft x IK ft..2 Mi ft. above (be Hour and about even withthe tops of the flumes (hi ibis platform arealso a…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.