It wasdecided to make the posts continuous onlyabove the third tier in order that the lowerwaling sets and struts might be jacked downif necessary to take care of any great dififer-ences that might be found in elevation ofrock at corners of cofferdam. It developedlater, however, that the jacking… … ^3f TYPICAL CROSS SECTIONS, MAIN PIERS,SUISUN BAY BRIDGE Mud was then jetted out from under thebottom wales, using, at first, a lYz inch pipetapered to a 1^^ inch nozzle, average pres-sure at pump being 125 pounds per squareinch. A diver was lowered to inspect thework but reported that this jet was…