Chicago : Engineering and Contracting Pub. Co. · leaf 277
d with the Taylor nozzle, seeFig. 2, which is designed to cover a squarearea. The elevation of the flow line at the set-thing tank is 45; the discharge line 43.5; thetop of filter beds, 36°. Mr. Ewing lived only to see the construc-tion work started, but his successors, Ewing& Stone Co. have… … [ntj VConlg Section AS Fig. i—Map of Purification Works at LaGrange. • n< 1 inn and 4 in. discharge having a capac-ity of 500 gals, per min., against a head of_<» It The pump is «•!»■« trically operated and Fir,, j—Plan, Longitudinal and Transverse Sections of La Grange Sewage Purification…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.