Inside Out Library · Explore

Types and details of bridge construction (1904)

Skinner, Frank W. (Frank Woodward), 1858-1932 · New York, McGraw · leaf 159

An illustration from Types and details of bridge construction, 1904, leaf 159
long. Three lugs project from eachedge of this bed plate and are slottedto receive \\ in. anchor bolts. The bear-ings are the same at both ends of the bridge, and although bothwere free to move longitudinally with temperature variations,no indications of such movement were noticed when thesedetails… … Beoring at End of 60 Girder.Gokteik Viaduct. SIMPLE SLIDING ENDS 143 umns. The 60-f t. girders being deeper than the 40-ft. girders,have their webs notched and horizontal flange angles rivetedto them to give them bearing with the 40-ft. spans on the samecap plates, and still keep the top flanges of…

Bridges

Internet Archive · Boston Library Consortium · Public Domain Mark 1.0. Free to use for anything.

More pictures from Types and details of bridge construction

More like this